Earlier this week, I (mostly) finished a ten-week-long renovation of the first floor of the house. There are still some more things on the long-term to-do list (strip and refinish the mantle, the pocket and interior doors; build transoms for above the interior doors; finish hanging the crown molding; buy new couches, etc.), but the bulk of the work is done.

Improvements shown in the slideshow above include: New paint on all the walls and trim, addition of picture rail and crown molding, rebuilding of the window seat under they bay window with oak flooring, two custom-built bookcases with lighting using black pipe and 1×12 wood salvaged from a barn near Wisner, Iowa, rewiring and adding decorative switches and plates to every light switch and power outlet, rewiring and rehanging the original chandelier that for the dining room, rewiring and hanging a chandelier purchased from the Johnston Funeral Home auction in the living room, new art work (including a collage of original plaster from the home) and the addition of a hand-painted “3060” on the transom above the front door.

These three rooms (the foyer, living room and dining room) mark the fourth in six months I’ve managed to refinish. Still, there’s a bathroom, a kitchen, a stairway and a couple of bedrooms that need attention. Plus a basement. And outside I need to build the front porch, realign/rebuild the garage and redo the roof and exterior paint. It’s never-ending, but worth the effort.

For a peek at how it looked before, click here.

Comments ( 1 )

The comments are now closed.


3060 Woolworth Ave. Omaha, NE 68105 | 402-517-1228 | contact@hanscompark.com
hanscompark.com © 2012-2019 Hanscom Park Studio
Featured graphic design and illustration © 2002-2019 Hanscom Park Studio and/or our clients